  1. Summary
  2. When laying bricks you need to bring together careful 
  3. planning and several skills. The steps below outline all 
  4. the tasks you need to complete for competent brick laying:
  5.  
  6.     1    Checking the foundations
  7.     2    Mixing mortar
  8.     3    Laying the mortar
  9.     4    Laying the first brick
  10.     5    'Buttering' the edge of the brick
  11.     6    Checking the level of the bricks
  12.     7    Building the courses
  13.     8    Checking the vertical
  14.     9    Pointing
  15.  
  16. Tools
  17. Trowel, spirit level
  18.  
  19. Materials
  20. Mortar, bricks
  21.  
  22. Step 1 - Checking the foundations
  23. When laying any brick ensure that the foundations are 
  24. solid. Remember, a patio may only be laid on a bed of sand, 
  25. which will not support the weight of a barbecue or other 
  26. structure. If in doubt pull up a paving slab to inspect the 
  27. foundations. Any movement of the substructure will cause the 
  28. mortar to crack and the structure to become dangerous. 
  29.  
  30. Step 2 - Mixing mortar    
  31. The technique for mixing mortar is similar to that for 
  32. mixing concrete. Mortar consists of cement, sand and a 
  33. plasticiser such as hydrated lime or a proprietary liquid. 
  34. The mix depends on the exposure level of the wall. Mortar 
  35. only remains workable for two hours and cannot be re-moistened 
  36. with water as this makes it unusable.
  37.  
  38. Step 3 - Laying mortar
  39. For small projects it is easier to purchase a ready mixed 
  40. bricklaying mortar which may need a plasticiser. Use a 
  41. builders trowel to lay some mortar in a sausage shape where 
  42. you want to lay the brick, it should be approximately 19mm deep. 
  43. Making grooves in the mortar will make it easier to tamp the 
  44. brick down.
  45.  
  46. Step 4 - Laying the first brick
  47. Always lay the first brick at a corner of the wall.
  48. If the brick has an indentation on one side, called a frog, 
  49. this should face upwards. Press the brick down until the 
  50. mortar is 10mm thick.  
  51.  
  52. Step 5 - 'Buttering' the edge of the brick
  53. When laying the second brick, mortar must also be added to 
  54. the edge you are butting against the first. æButterÆ the 
  55. mortar against the end of the brick ensuring there are no 
  56. air pockets as these will later collect water and cause 
  57. damage in a frost.
  58.  
  59. Step 6 - Checking the level of the bricks
  60. After laying four or five bricks check they are level with a 
  61. long spirit level. It is very important to make the foundations 
  62. true as any errors here will be magnified later. If you are 
  63. unhappy with the height of any brick use the trowel to tamp it 
  64. down. If it is too low do not hesitate to remove it and apply 
  65. some mortar. Only proceed when you are completely happy that 
  66. the foundation level of bricks is true.    
  67.  
  68. Step 7 - Building the courses
  69. Build up the various courses or levels of bricks in the same 
  70. manner. Any cut bricks you use should be placed with the cut 
  71. side facing the join. Ensure that the bond is true, that is 
  72. that none of the joins are above one another and are always 
  73. about halfway along the bricks above and below. 
  74.  
  75. Step 8 - Checking the vertical    
  76. As you build up the courses, periodically check that they are
  77. vertical and not leaning. Remove any excess mortar as you work.
  78.  
  79. Step 9 - Pointing
  80. Once the mortar is dried it is necessary to shape the exterior 
  81. mortar. Scrape out 13mm of mortar. Reapply fresh mortar with a 
  82. pointing trowel creating a weatherstruck joint as shown. 
  83. This should ensure a neat appearance and provide a more 
  84. effective rebuff to the elements.